top of page

The clocks go back on 25 October: have you checked the night shift?

Writer: Karen Lewis
Karen Lewis
Oct 24
3 min read

Updated: Oct 29

The clocks go back by one hour at 2am on Sunday 25 October 2026. While many people will be asleep, some teams will be working through the repeated hour.


We recommend a short check of the operational and pay arrangements before tonight’s shift begins. The question is how the shift will actually run, how time will be recorded and which terms apply to the people working it.


Confirm the elapsed hours


A shift from 10pm on Saturday to 6am on Sunday spans nine elapsed hours when the clocks move back, before accounting for breaks. A rota showing only the local start and finish times can obscure that extra hour.


We suggest confirming the handover time explicitly and checking that both teams understand it. Identify who is on call if someone is late or the handover takes longer than planned.


Ask supervisors how they will distinguish entries made during the first and second occurrence of 1am. Clear records can help explain events later, especially where access logs, incident reports and timesheets use different systems.


Check the pay arrangements


Read the relevant terms and any applicable agreements before deciding how to pay the shift. GOV.UK explains that overtime pay arrangements are usually set out in the employment contract, while minimum wage requirements still apply.


We recommend assessing the actual arrangement rather than assuming everyone receives an extra payment or that nobody does. An hourly arrangement may raise different questions from a fixed salary or a shift payment. Check the applicable minimum wage calculation for the work type and pay reference period.


Give payroll the information it needs, including any authorised adjustments. If the contractual position is unclear, resolve the question with appropriate advice and explain the next step to the employee.


Review working time and cover


GOV.UK sets out additional limits for night workers, including an average eight-hour limit in each 24-hour period and stricter rules for work involving special hazards or strain. Exceptions and sector-specific arrangements need checking too.


We recommend reviewing the shift against the rules that apply to your workforce, including rest arrangements. Look at breaks, supervision and any duties after the shift. A clock change should prompt a practical review of cover rather than an assumption that the existing rota answers every question.


Include transferred and reorganised teams


Where employees have joined through TUPE, we recommend checking the relevant terms with the person responsible for the transfer records. Do not assume a shared rota means every employee has identical pay arrangements.


After restructuring, confirm who now approves additional time and who supplies information to payroll. A change in reporting lines can leave an otherwise familiar process without a clear owner.


Follow through after the shift


We suggest checking the recorded hours and any pay query promptly after the shift. Keep the explanation of how the arrangement was applied, and use any system problem to improve preparation for the next clock change.


At The HFactor, we bring 85 years of combined HR experience to HR audits, payroll support, restructuring and TUPE planning.


For a initial meeting about working-time records or pay processes, visit www.the-hfactor.com and complete our enquiry form.


Sources checked 24 October 2026


GOV.UK — UK clock-change dates and times



GOV.UK — Overtime and contractual pay arrangements



GOV.UK — Night working hours and limits



Acas — Checking minimum wage pay



 
 
 

Comments


bottom of page